Mercedes-Benz Stadium

Atlanta, Georgia, United States

Filter projects by:

Market

  • Cities

    Cities EMIA

  • Commercial & Residential

    Mixed Use

    Office

    Residential

    Retail

  • Education

    Colleges & Universities

    Schools

  • Energy

    Alternative & Renewable Energies

    Emissions & Combustion Products Control

    Energy Efficiency

    Fossil Fuel Generation

    Gas Generation

    Hydroelectric Generation

    Siting and Permitting

    Transmission & Distribution

  • Healthcare

    Clinical Hospital

    Life Sciences

    Senior Living

  • Industrial

    Agriculture, Food & Beverage

    Automotive & Heavy Equipment & Machinery

    High Tech

    Industrial Real Estate, Logistics & Retail

    Manufacturing

    Mining & Metals

    Pharmaceutical/Specialty Chemicals

    Pulp & Paper

  • Justice

  • Leisure

    Arts and Culture

    Hotels and Resorts

    Themed Entertainment and Mixed-Use

  • National Governments

    Civil Works

    Disaster Resilience

    Energy

    Environment

    Infrastructure & Facilities

  • Oil, Gas & Chemicals

    Chemical/Petrochemical

    Downstream

    Midstream

    Upstream

  • Sports and Venues

    Collegiate

    Convention Centers

    Olympics & Mega-Events

    Stadiums & Arenas

  • Transportation

    Aviation

    Bridges & Tunnels

    Connected and Autonomous Vehicles

    Freight Rail

    Highways & Roads

    Mass Transit

    Ports & Marine

  • Water

    Coastal

    Dams, Hydropower & Levees

    Industrial Water

    Tunnels, Conveyance, Collection & Distribution

    Wastewater Treatment & Reuse

    Water Treatment

    Watershed and Ecosystem Management

Service

  • AECOM Capital

  • Alternative Delivery Models

  • Architecture and Design

    Architecture

    Asset Advisory

    Interior Architecture

    Strategy Plus

    Urbanism + Planning

  • Cities Solutions

  • Construction Management

  • Construction Management

    AECOM Hunt

    AECOM Tishman

  • Converged Resilience

  • Cost Management

  • Digital Infrastructure Services

  • Economics

  • Electric Vertical Takeoff and Landing Solutions

  • Engineering

    Ground Engineering

  • Environmental Services

    Air Quality Consulting and Engineering

    Climate Adaptation

    EHS Management Consulting and Compliance

    Environmental Contracting

    Environmental/Social Impact Assessment and Permitting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Fabrication

  • Finance

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial Services

    Pedestrian Modelling

  • Process Technologies

  • Program Management

  • Public-Private Partnerships

  • Risk Management & Resilience

    Critical Infrastructure Protection

  • Simulation Models

    Rail Simulations

  • Tunnels, Trenchless Technology and Underground Infrastructure

  • Vertical Transportation Services (North America)

  • Visualization and Virtual Reality

Location

  • Africa

  • Algeria

  • Antarctica

  • Australia

  • Azerbaijan

  • Bahrain

  • Belgium

  • Bolivia

  • Bosnia and Herzegovina

  • Brazil

  • British West Indies

  • Canada

  • Caribbean-Puerto Rico

  • China

  • Colombia

  • Croatia

  • Czech Republic

  • Egypt

  • Finland

  • France

  • Germany

  • Greece

  • Greenland

  • Haiti

  • Hong Kong

  • India

  • Indonesia

  • Iraq

  • Ireland

  • Italy

  • Japan

  • Kenya

  • Kingdom of Saudi Arabia

  • Kuwait

  • Liberia

  • Lithuania

  • Malaysia

  • Maldives

  • Mali

  • Malta

  • Mauritania

  • Mexico

  • Monaco

  • Montenegro

  • Myanmar

  • Netherlands

  • New Zealand

  • Norway

  • Oman

  • Panama

  • Papua New Guinea

  • Peru

  • Philippines

  • Poland

  • Portugal

  • Qatar

  • Romania

  • Singapore

  • Slovakia

  • South Africa

  • South Korea

  • Spain

  • Sri Lanka

  • Sweden

  • Switzerland

  • Taiwan

  • Turkey

  • Ukraine

  • United Arab Emirates

  • United Kingdom

  • United States

  • Vietnam

  • Worldwide

AECOM Hunt served as construction manager – in a joint venture with Holder Construction, C.D. Moody Construction, and H.J. Russell & Company – for the state-of-the-art stadium, which is home of the National Football League’s Atlanta Falcons and Major League Soccer’s Atlanta United.

The stadium officially opened to fans on August 26, 2017 for an Atlanta Falcons versus Arizona Cardinals preseason exhibition game. As a multi-purpose venue, the stadium’s flexible design allows for up to 83,000 seats.

A standout feature of the stadium is a one-of-a-kind retractable roof composed of eight, 1,600-ton panels that each cantilever to resemble a camera shutter opening and closing. In addition, Mercedes-Benz Stadium houses a circular, 360-degree, “halo” video board that completely surrounds the top of the dome. The facility saves more than 40-percent in energy use compared to typical stadiums due to an extensive water capture and reuse system, over 4,000 solar photovoltaic panels, LED lighting, energy monitoring equipment, and energy-efficient glazing.

Fast facts

AECOM Hunt served as construction manager (in the joint venture Holder-Hunt-Russell-Moody) for the new 72,000-seat multipurpose Mercedes-Benz Stadium. This world-class sports and entertainment facility is the new home to the National Football League’s Atlanta Falcons and Major League Soccer’s Atlanta United. The stadium will host major sports and entertainment events, including the 2018 College Football Playoff Championship game and 2020 NCAA Men’s Final Four basketball championship.

Changing the game

The stadium’s major architectural highlight is its one-of-a-kind retractable roof — composed of eight, 1,600-ton panels that each cantilever 200 feet — that looks similar to a camera shutter opening and closing. It takes less than 8 minutes to open the roof.

A new 360-degree HD “halo” video board is the largest in the world at 58 feet tall and 1,000 feet in circumference. It features 64,000 square feet of LED, giving every fan excellent sightlines no matter where they sit.

Over 1,800 wireless access points, and 4,000 miles of fiber optic cable running to the access points, ensure the stadium is “future proof.”

Going green

Water conservation and management was a core focus of the stadium’s design. The facility captures rainwater for reuse in a cooling tower and in irrigation of the landscape and trees. It is 42 percent more water efficient than the Georgia Dome.

Solar panels, LED lighting, energy monitoring equipment and energy-efficient glazing will save more than 40 percent in energy use compared to typical stadiums.